Award Date Client/Main Contractor Project Title Scope of Work & Our Role
APRIL 2020 TRANSCO Re-Coating, Wrapping for Piping Network Inside MDZ Pumping Station Visual Inspection and Repairing of Underground and above ground pipelines in pumping station. Blasting, Painting and Wrapping repair for pipelines.
APRIL 2019 ADNOC/CPECC BAB Intigrated Facilities Project ,HABSHAN Drilling Construction Services for Normal Earth Wells, Deep Well, Cathiodic Protection Wells and Installation of Earth Bar, Ground bed Anode
JANUARY 2018 ADOC Mubarraz Facility Maintenance Service at Mubarraz Island. Fabrication and installation of pipe spools, pipe supports and related NDT works
JUNE 2018 EGA/CTS Cathodic protection Works at EGA, TAWEELA Installation of TR Unit, Installation of DWGB (Deep well ground bed), Installation of AC and DC Cables, Installation of Negative Distribution Box (NBD), Installation of Cathode Bonding Boxes (CBB), Installtion of CP Test station, Installation of CP Sacrificial anode etc.
MARCH 2018 ADNOC Refining EPC for Upgrading of Gas Supply Pipelines in Laboratory at Ruwais Refinery-(East) Replacing of existing piping/tubing and related equipment for supplying the different types of GAS
DECEMBER 2017 DUSUP/CTS CP System Relocation on 48” RM 2 Pipe Line in Dewa. Drilling and Installation Of Casing and Ground Bed Anodes Installation of sacficial Anodes.Excavation AC & DC Cables Laying concrete Foundation casting and Installation of Anode Junction Box and Transformer Rectifiers.
OCTOBER 2017 POWER INFRA PROJECTS CONT. LLC/SHARJAH Fabrication & Welding of Instrument Supports (Fabrication & Welding) Painting of Instrument Supports & Man Power Supplied
AUGUST 2017 NEPTUNE/EMAS/ ARAMCO Lifting Frame Fabrication (14 meter long). Procurement, Engineering, Fabrication of beam and frame, Load Test(191Ton), Welding Works, NDT, Painting and Delivery to Saudi Arabia
JULY 2017 NEPTUNE /ZADCO Lifting Spreader Beam Fabrication (14 metre long). Procurement,Engineering, Fabrication, Load Test, Painting and Delivery.
APRIL 2017 HORSE POWER REPAIR &MAIN. MECHANICAL LLC Fabrication & Welding of Instrument Supports Man Power Supply.
MARCH 2017 GASCO/CTS Cathodic Protection Anode Installation @ GASCO RUWAIS. Replacement of ICCP and SACP Anodes in GASCO plant area (Concrete & Asphalt), testing & commissioning.
MARCH 2017 GASCO/CTS Electrical cable laying @ GHANTOOT Hand excavation, Electric cable laying and Backfilling
DECEMBER 2016 ADDC SOW Perkin 120 kw Mobile Generator and trailer repair. Chase repairing, Radiator foundation, Panel foundation, Support frame, Lifting jacks with small tire.
OCTOBER 2015 TAKREER/GS E&C/RS(ME) Inter Refineries Pipeline (IRP-II) Project. SV-Station Piping Works & Support Works – 10 Nos. SV Station Including, Fabrication, Installation & Hydro Testing.
JUNE 2015 FERTIL/ SAMSUNG ENGINEERING Fertile – 2 Urea Ammonia Expansion project at Ruwais Drilling and installation of CP Deep Well Ground Bed Anode (19 nos.)
AUGUST 2013 ALSA ENGINEERING & CONSTRUCTION Fire Water Backup Pipeline at MOT Fujairah Drilling and installation of CP Deep Well Ground Bed Anode & earth rod deep boreholes (6 nos.)
JULY 2011 TRISTAR ENGINEERING & CONSTRUCTION Grouting of Deep Wells Grouting of 120.00 meter deep wells
JULY 2011 MASDAR/ FANOY GAS LLC Solar Power 100MW CCP Plant SHAMS – 1 Drilling and installation of C P Deep Well Ground Bed Anodes for Natural Gas Pipeline
MAY 2011 MASDAR / UTE ABENER TEYMA EMIRATES 1 Solar Power 100MW CCP Plant SHAMS – 1 Drilling & Installation of Earth Rods Deep Boreholes (27 wells)
APRIL 2011 GASCO/CTS Cathodic Protection Installation @ GASCO AL AIN. Drilling and installation of CP Deep Well Ground Bed Anode.
APRIL 2011 GASCO/CTS Cathodic Protection Installation @ GASCO GHANTOOT Drilling and installation of CP Deep Well Ground Bed Anode.
JUNE 2010 TAFSEER/PAL TECHNOLOGY SERVICES Emirati Homes At Yas Island Construction Of Villas
JAN 2010 TAKREER / GTM Construction Of Concrete Fire Shield Walls For Ruwais Refinery. Procurement, Piping, Fabrication Installation, Hydro Testing And Commissioning
JULY 2009 GASCO / GSPI 6” Natural Gas Pipe Line To Gulf Sponge Iron Company LLC @ ICAD 1 Protection Slab Pre-Casting And Installing On For Protect 6” Natural Gas Pipe Line 2 Km Long
JULY 2009 GASCO/ GSPI 6” Natural Gas Pipe Line To Gulf Sponge Iron Company LLC @ ICAD 1 Technical Support And Inspection For Fabrication, Installation, Hydro Test And Commissioning of 2 Km Long Natural Gas Pipe Line Of 6” Diameter